Work on the building envelope and interior fit-out is progressing at a steady pace at the construction site for the storage facility in Les Bois.

ModularityNewsTimber construction April 15, 2026

Construction project underway in the Franches-Montagnes

Once the structural elements have been assembled, the installation of interior and exterior finishes reveals the building’s unique volumetry. This provides an opportunity to appreciate the many challenges posed by the alternating sequence of volumes designed to draw in natural light from the upper levels. The close collaboration between designers and builders ensures a high degree of precision.