In Ostermundigen, a new climbing and bouldering hall has been built based on a design concept that shapes the structure like a rock with narrow openings resembling "rock fissures." In contrast, the interior is constructed and materialized in wood, creating a warm and inviting atmosphere around the climbing walls and bouldering blocks. The building also includes a bistro, changing rooms, training rooms, and office spaces, providing all necessary facilities for smooth operations. The new structure blends naturally into its surroundings, with only its vertical expansion hinting at its impressive, Switzerland-wide unique climbing height of 18 meters.
Ostermundigen (BE)
o’bloc Bouldern und Klettern
02. - 11.2015
Climbing gym, two bouldering walls, restaurant, changing-rooms, offices and training classrooms
Anlagekosten BCC 1-9: CHF 4.1 Mio
Gebäudekosten BCC 2: CHF 2.1 Mio
Geschossfläche SIA 416: 1’800 m2
Gebäudevolumen SIA 416: 17’000 m3
Quadratmeterpreis SIA 416 (BCC 2): CHF 1’166
Kubikmeterpreis SIA 416 (BCC 2): CHF 124