Loading...

Description

Based on a valorization approach of the pre-existing typology, the former industrial building was turned into some ten lofts. The lower levels, which date back to 1910, were renovated. The extra height of the building, which dates back to 1957, was demolished and rebuilt as a continuum of the original volume. The building is primarily dedicated to residential functions, thanks to the addition of specific volumes housing kitchens, bathrooms and equipment. It also includes an artist’s studio on the ground floor.

Files

Download
520 KB

Project data

Location

Neuchâtel

Client

Bauart Architects and Planners Ltd

Project

2001 - 2003

Realization

2003 - 2004

Global cost BCC 0-9

CHF 5,1 Mio

Programm

9 lofts + 1 artist’s studio

Categories
Housing
Build on existing
You must agree to the use of third-party cookies to view this content.