The important scale of the volumes is considered as a chance for this rapidly developing area. Two new constructions complete the current complex, while two existing buildings are raised. In addition, their outer envelope is remodeled, which allows adapting technical building systems to Minergie standards. Exterior spaces punctuate the housing structure and provide openings and transparency to the entire area.
Köniz (BE)
Federal Office for Buildings and Logistics FOBL
Competition with prequalification 2007, 4th prize
12