Located in a loosely structured urban district, this realization gathers offices and workshops within a specific volume. The façade of the building, which integrates signposting elements on the street side, gives a strong identity to the whole complex. Specific attention was given to energetic aspects, which allowed reaching Minergie standard requirements.
Thun
Thun Commune / Energie Thun SA
Competition 1999
CHF 12,1 Mio
CHF 340.–
05.2000 - 10.2002
1. MINERGIE Prize, Bern 2002