The new pharmaceutical site has been designed like a campus with production and administration areas, a storage centre and a building for drug packaging. An overhead glass walkway provides an efficient link-up between the different areas. The architectural concept also opens up various possibilities for extension in future. The approach aims for volumetric integration adapted to the site’s characteristic features, involving a rational architectural language in keeping with the production programme, multi-purpose flexibility and efficient functional organization.
Couvet (NE)
Celgene International Sàrl
Industrial campus with production, administration, packaging, warehouse, welcome area and restaurant
Approx. 106'000 m3
2016 - 2018