The opening of the new o’bloc climbing hall in Ostermundigen took place on August 31. The new building is directly connected to the existing o’bloc climbing and bouldering facility and was built without a basement, on a reinforced concrete slab. It also features an outdoor bouldering area, allowing visitors to climb outside on the roof.
Project partners
Architecture: Bauart
Client: o’bloc AG, Ostermundigen
Timber construction and general contractor: Beer Holzbau
Engineering for timber construction, solid construction and fire safety: holzprojekt AG