The new pharmaceutical site has been designed like a campus.

EcologyRealisedIndustry

The project is designed as a campus. It primarily includes production areas, offices, a storage center, and a building dedicated to pharmaceutical packaging facilities. A glazed walkway provides an efficient connection between the various buildings. The architectural concept also allows for future expansions. The volumetric integration is tailored to the site’s characteristics, while the rational architectural language reflects the needs of the production program. The design ensures high flexibility of use and efficiency in the organization of functions.

Location

Couvet (NE)

Client

Celgene International Sàrl

Programme

Industrial campus with production, administration, packaging, warehouse, welcome area and restaurant

SIA Volume 416 total

Approx. 106'000 m3

Realization

2016 - 2018