A phased project linking nature, city, and transport through a light-filled center.

ClimateRealisedRetailGeneral PlannerCompetition 1st prize

The realization of the new Marin Centre was planned in stages in order to replace the existing center without interrupting commercial activities. From the motorway located in the north, a direct access leads to the five-stories parking. From there, ramps guide to the main space, a central hall flooded with natural light penetrating through the glazed roof. At the west end, a terrace opens out to the natural landscape and the pedestrian walkway linking the Centre to the village of Marin. The station situated south of the Center enables direct access by public transport.

Location

La Tène (NE)

Client

Marin Centre SA

Type of mandate

Competition 2005, 1st prize

Costs CFC 1-9

CHF 178 Mio

Cost/m3 BCC 2

CHF 197.- / m3

Realization

2007 - 2011

« Habilement intégré dans le contexte de l'agglomération neuchâteloise, ce complexe étonne par son architecture [...] En termes de design et de technique énergétique, Marin Centre occupe donc une place à part parmi les centres commerciaux. »

Prix Lignum 2012,
Hochparterre, no. 10, 2012