The modular wooden construction Schlossmatt represents a new generation of sustainable school spaces in Burgdorf.

ModularityRealisedEducationTimber construction

The new building complements the listed school complex from the 1950s and forms a boundary to the south of the school site. To match the scale of the existing buildings, the extensive program is divided into two volumes. These two wings are connected by a multi-story open intermediate structure, which serves as both an arrival area and a covered break space. The accessible roof of the two-story wing can be used as an outdoor classroom, a student garden, or a sheltered break area. The Schlossmatt timber modular building represents a new generation of school construction in Burgdorf. In line with the principles of the circular economy, the modules can be dismantled and reused at another school site.

↗ Learn more about the project on our partner platform modulart.ch

Location

Burgdorf

Client

City of Burgdorf

Key figures

Building volume: 10,650 m³
Floor area: 3,030 m²

General contractor

Blumer Lehmann AG

Deadlines

Planning 08/21 - 02/22
General contractor planning 05/23 - 04/24
Implementation 03/24 - 10/24

Costs CFC 1-9

approx. CHF 13 Mio.

Raumprogramm

2 kindergartens, 7 classrooms, day school

Energy standard

Minergie-Eco